Bajo Grande Power Station
Solidaris LLC was responsible for the procurement of major equipment for this project which included two (2) 50 MW GE LM6000 gas turbines, chimneys for the turbines, step up transformers for the turbines, auxiliary transformers for internal plant consumption, iso-phase buses for the turbines, and generator breakers for the turbines. In addition, Solidaris LLC was also responsible for the procurement and transportation to Venezuela of the Balance of Plant (BOP) including the demineralized reverse osmosis water treatment system, fuel treatment system, waste water treatment systems, instrument and service air systems, fire control system, DCS control system, internal electrical system, cooling system, black start generator system, spare parts for the entire facility, including the turbines and all piping, valves and pumps. Solidaris LLC was also responsible for securing and reviewing all preliminary engineering services for the project including the project P&ID’s. Finally, Solidaris LLC also secured all needed Technical Assistant (TA) support required for the erection and commissioning project phases, provided direct commissioning support, and identified personnel for construction, commissioning and operation activities on site.
San Timoteo Power Station
Solidaris LLC was responsible for the procurement of major equipment for this project which included a 100 MW GE LMS100 gas turbine, a chimney for the turbine, a step up transformer, auxiliary transformers for internal plant consumption, an iso-phase bus and a generator breaker. In addition, Solidaris LLC was also responsible for the procurement and transportation to Venezuela of the Balance of Plant (BOP) including the demineralized ion-exchange water treatment system, fuel treatment system, waste water treatment systems, instrument and service air systems, fire control system, DCS control system, internal electrical system, cooling system, black start generator system, spare parts for the entire facility, including the turbines and all piping, valves and pumps. Solidaris LLC was also responsible for securing and reviewing all preliminary engineering services for the project including the project P&ID’s. Finally, Solidaris LLC also secured all needed Technical Assistant (TA) support required for the erection and commissioning project phases, provided direct commissioning support, and identified personnel for construction, commissioning and operation activities on site.
Morichal Power Station
Solidaris LLC was responsible for the procurement and transportation to Venezuela of major equipment for this project which included two (2) 50 MW GE LM6000 gas turbines, chimneys for the turbines, step up transformers for the turbines, auxiliary transformers for internal plant consumption, iso-phase buses for the turbines, and generator breakers for the turbines. Solidaris was also responsible for preliminary conceptual engineering for the project which included P&ID’s.
San Lorenzo Barge Power Project
Solidaris LLC was responsible for the procurement and transportation to Venezuela of the fuel treatment system for the San Lorenzo barge power project. This equipment included centrifuges, pumps and valves needed to treat and supply fuel to barge mounted turbine. Solidaris also supplied Technical Assistants (TA) as required for the startup and operation of the project and provided personnel on site as needed for further technical assistance.